Throughout the two year life of the TIP, staff tracks and makes routine updates to project information on a periodic basis. Revisions to the TIP are typically required for the following reasons:
- To add or delete a project from the TIP
- To change the State or federal portion of a project’s cost.
- To change the year when State or Federal funds are anticipated to occur for a project phase
- To change a project’s scope of work
- To change the source of State or Federal funds
For approved or proposed revisions of the TIP click on the link(s) below.
FIle Download:
| Attachment | Size |
|---|---|
| 2.14 MB | |
| 2.31 MB | |
| 1.77 MB | |
| 2.01 MB | |
| 1.87 MB | |
| 2.53 MB |
